An addition is a marathon with a paperwork mile at the start. Here's the realistic sequence, including the parts that involve waiting.
Step 1: Feasibility before dreams
Before falling in love with a floor plan, get the site checked: lot setbacks, easements, foundation condition, utility locations. A free walk-through settles most of this in an hour and saves months of planning the impossible.
Step 2: Scope and budget honestly
Decide what the addition must do, not everything it could do. Wet rooms cost multiples of dry rooms; simple footprints beat complex ones. The full driver list is in what drives addition cost and on our pricing page.
Step 3: Design and selections
Plans get drawn, and — this matters — selections get made now. Windows, doors, flooring, fixtures. Every decision made before ground breaks is a delay that never happens.
Step 4: Permits
Waco, Temple, and Belton each run their own permitting process, and the clock is theirs, not yours or ours. A contractor who builds permit time into your written schedule is being honest; one who waves it off is starting your relationship with a guess.
Step 5: The build
Foundation, framing, roof tie-in, mechanicals, inspections, finish-out. Months, not weeks. You should know before signing who will be on site, how often you'll hear from them, and what happens when weather moves a pour date. On our jobs, that's a daily update and one accountable name — see the process.
Step 6: The connection and sign-off
The wall between old house and new space opens near the end, and the job finishes with a walk-around you attend. Nothing is done until you've seen it.